Netgear M4100-50-POE (FSM7250Pv1h1) - 48‐port FE + 2 GE Combo L2 Managed PoE Switch User Manual
Configuration Examples
446
M4100 Series Managed Switch
13.
Click the ADD button.
In this example, assume that Switch 1 has become the root bridge for MST instance 1, and
Switch 2 has become the root bridge for MST instance 2. Switch 3 has hosts in the Sales
department (ports 1/0/1, 1/0/2, and 1/0/3) and in the HR department (ports 1/0/4 and 1/0/5).
Switches 1 and 2 also use hosts in the Sales and Human Resources departments. The hosts
connected from Switch
Switch 2 has become the root bridge for MST instance 2. Switch 3 has hosts in the Sales
department (ports 1/0/1, 1/0/2, and 1/0/3) and in the HR department (ports 1/0/4 and 1/0/5).
Switches 1 and 2 also use hosts in the Sales and Human Resources departments. The hosts
connected from Switch
2 use VLAN 500, MST instance 2 to communicate with the hosts on
Switch 3 directly. Likewise, hosts of Switch 1 use VLAN 300, MST instance 1 to communicate
with the hosts on Switch 3 directly.
with the hosts on Switch 3 directly.
The hosts use different instances of MSTP to effectively use the links across the switch. The
same concept can be extended to other switches and more instances of MSTP.
same concept can be extended to other switches and more instances of MSTP.