Netgear RN422X122 – ReadyNAS 4220 2U 12-Bay 12x2TB Enterprise Drives w/ 2x 10GbE Hardware Manual
3.
Slide the top cover back.
4.
Lift the top cover from the chassis.
You can now access the inside of the system.
Replace a Fan
If a fan fails, the remaining fans ramp up to full speed, the Error LED on the control panel lights, and an
email alert is sent to the system administrator. Replace a failed fan as soon as possible. Remove the top
chassis cover while the system is still running to determine which fan failed.
email alert is sent to the system administrator. Replace a failed fan as soon as possible. Remove the top
chassis cover while the system is still running to determine which fan failed.
Fans are hot-pluggable, so you do not need to power down your system when replacing a fan.
Maintenance
77
ReadyNAS OS 6.5