Cisco Cisco Expressway Installation Guide

Page of 15
Installation
Install the Unit in a Rack
See
for information
on how to install the unit in a rack.
Connect and Power on the Unit
First connect the power cords to the unit, and then connect them to a grounded AC power outlet.
See
for power
specifications.
The power button is on the top-left corner of the front panel.
When you plug in the CE500 appliance for the first time, leave it in standby mode for 5 minutes before pressing the
power button. This time allows the onboard CIMC to boot; ready the self-test; perform a hardware check; and prepare the
power characterization test. Failure to wait adequate time will postpone the power characterization test until the next
boot.
When you power on the unit, the system performs a self-test and the unit automatically restarts. This restart is expected
behavior.
The first boot takes approximately 5 minutes due to the initial power characterization test. Any subsequent boot of the
system takes approximately 2 minutes.
The power characterization test displays the message Performing Platform Characterization … when running.
If the power characterization test runs on subsequent bootups, causing a lag in the boot time, it is important that you
disable it. It is especially important to disable the test in a clustered environment to avoid issues. See
Specific Issues in
the
Troubleshooting
section for more information.
To verify the power status look at the Power Status LED (see
):
Off — There is no AC power present in the server.
Amber — The server is in standby power mode. Power is supplied only to the CIMC and some motherboard
functions.
Green — The server is in main power mode. Power is supplied to all server components.
5
Cisco Expressway CE500 Appliance Installation Guide