Cisco Headend System Release 2.7 Installation Guide

Page of 172
 
 
Checkout Procedures for the ASI Card 
4013154 Rev C 
141 
 
Checkout Procedures for the ASI Card 
Introduction 
After completing the procedures in this appendix to install and configure the ASI 
card, complete some or all of the tests in this section to confirm that the ASI card is 
working as intended. These tests are in outline form, only. Cisco assumes that 
upgrade engineers are familiar with the detail behind each test. 
 
Confirming the Session Count 
After completing the procedures in this appendix to install and configure the ASI 
card, complete some or all of the tests in this section to confirm that the ASI card is 
working as intended. These tests are only in outline form. Cisco assumes that 
upgrade engineers are familiar with the detail behind each test. 
1  Press the Options button on the front panel of the BFS QAM until the Session 
Count appears. 
2  Confirm that the number of sessions on the BFS QAM is equal to the number of 
BFS sessions on the DNCS. 
3  Re-run the procedures in Verify DBDS Stability (on page 21). 
 
Verify DBDS Stability 
Re-run the procedures in Verify DBDS Stability (on page 21).