Product Bulletin No. 3150 
End-of-Sale and End-of-Life Announcement for 
the Cisco Catalyst Inline Power Patch Panel 
Cisco Systems
®
 announces the end-of-sale and end-of-life dates for the Cisco
®
 Catalyst
®
 Inline Power Patch Panel. The last 
day to order the affected product is May 25, 2006. Customers with active service contracts will continue to receive support 
from the Cisco Technical Assistance Center (TAC) until May 25, 2011.
Table 1 describes the end-of-life milestones, definitions, and dates for the affected product. Table 2 lists the product part numbers affected by this 
announcement. 
Customers are encouraged to migrate to one of our Cisco Technology Developer Partner Program members, PowerDsine, and their PowerDsine 
6548 or PowerDsine 6024G, both of which provide support for the new IEEE 802.3af and Cisco prestandard power schemes. Information about the 
replacement product can be found at: 
http://www.powerdsine.com
. Tables 3 and 4 provide the relevant information for migrating to the replacement 
products. 
Table 1. 
End-of-Life Milestones and Dates for the Cisco Inline Power Patch Panel 
Milestone 
Definition 
Date 
End-of-Life 
Announcement Date 
The date the document that announces the end of sale and end of life of a product is 
distributed to the general public. 
November 25, 2005 
End-of-Sale Date 
The last date to order the product through Cisco point-of-sale mechanisms. The product 
is no longer for sale after this date. 
May 25, 2006 
Last Shipment Date 
The last-possible ship date that can be requested of Cisco and/or its contract 
manufacturers. Actual ship date is dependent on lead time. 
June 15, 2006 
End of Software 
Maintenance Releases 
Date 
The last date that Cisco Engineering may release any final software maintenance 
releases or bug fixes. After this date, Cisco Engineering will no longer develop, repair, 
maintain, or test the product software. 
May 25, 2007 
End of Routine Failure 
Analysis Date 
The last-possible date a routine failure analysis may be performed to determine the cause 
of product failure or defect. 
May 25, 2007 
End of New Service 
Attachment Date 
For equipment and software that is not covered by a service-and-support contract, this is 
the last date to order a new service-and-support contract or add the equipment and/or 
software to an existing service-and-support contract. 
May 25, 2007 
End of Service Contract 
Renewal Date 
The last date to extend or renew a service contract for the product.  
November 25, 2010 
Last Date of Support 
The last date to receive service and support for the product. After this date, all support 
services for the product are unavailable, and the product becomes obsolete. 
May 25, 2011