Cisco Cisco CRS Line Card Chassis Enhanced Installation Guide

Page of 35
◦Rack shelf spacers (2)
◦Pull handles (2)
The Cisco CRS 8-Slot Line Card Chassis Enhanced router is shipped in a double-wall carton on a standard shipping pallet. Always
transport the chassis in its original packaging and make sure that the system is transported and stored in an upright position. If you
plan to store system components before the installation, be sure to store the components carefully and in their original shipping
containers to prevent accidental damage.
Key Chassis Specifications
A newly received Cisco CRS 8-Slot Line Card Chassis Enhanced router in its shipping carton and on a pallet has the following
physical characteristics:
• 418.3 lb. (189.7 kg) chassis with shipping crate and pallet
• 330.8 lb. (138 kg) chassis with fans, PDUs, blanks, and impedance carriers (as shipped)
• Pallet length: 48 in. (121.3 cm)
• Pallet width: 37.12 in. (94.3 cm)
• Pallet height: 10.5 in. (26.6 cm)
• Shipping carton height: 50.87 in. (129.2 cm)
Do not stack the Cisco CRS 8-Slot Line Card Chassis Enhanced router shipping cartons, because serious
damage to the components can occur.
Caution
Safety Guidelines
Before you perform any procedure in this document, review the safety guidelines in this section to avoid injuring yourself or damaging
the equipment.
The following guidelines are for your safety and to protect equipment. The guidelines do not include all hazards. Be alert.
• Keep the work area clear and dust-free during and after installation. Do not allow dirt or debris to enter into any laser-based
components.
• Do not wear loose clothing, jewelry, or other items that could get caught in the router while working with MSCs, FPs, PLIMs,
or their associated components.
• Cisco equipment operates safely when used in accordance with its specifications and product-usage instructions.
• Be sure to power down a fixed configuration PDU or modular configuration power shelf before removing it from the chassis.
• Do not work alone if potentially hazardous conditions exist.
Verifying the Securing Location
Verifying the recommended space also ensures that you have enough space available to perform the initial installation of the chassis
and its components.
6