Cisco Cisco CRS-X Multishelf System Installation Guide

Page of 51
Change Summary
Date
Revision
Modified the
section with new information and
technical corrections. The term “outrigger
kit” was changed to “alternate chassis
floor-mounting kit.”
March 2007
78-17535-03 B0
Updated this document with technical
corrections.
September 2006
78-17535-02
Initial release of this document
April 2006
78-17535-01
Obtaining Documentation and Submitting a Service Request
For information on obtaining documentation, submitting a service request, and gathering additional information, see the monthly
Whats New in Cisco Product Documentation , which also lists all new and revised Cisco technical documentation, at:
Subscribe to the Whats New in Cisco Product Documentation as a Really Simple Syndication (RSS) feed and set content to be
delivered directly to your desktop using a reader application. The RSS feeds are a free service and Cisco currently supports RSS
version 2.0.
Chassis Unpacking Overview
This section provides information about the Cisco 16-slot chassis before you unpack it and transport it from the loading dock to the
final installation location.
This section contains the following topics:
Chassis Packaging
Depending on the number of options you ordered, the Cisco CRS router arrives packaged in several shipping crates and pallets. The
line card chassis is shipped in several crates that reduce the potential for product damage during routine material handling and shipment.
To protect the chassis:
• Always store the chassis in its original packaging in an upright position.
• If you plan to store chassis components before the installation, be sure to store the components carefully and in their original
shipping containers to prevent accidental damage.
Each shipping box has a yellow label on the outside of the box identifying the number of boxes in your shipment. For example 1 of
6, 4 of 6. The 16-slot chassis is shipped on a pallet by itself and arrives inside a polyethylene bag enclosed in a plywood box, held
in place by steel clips. Other system components are shipped in separate crates and can arrive at the final chassis site at different
times.
5