Cisco Cisco NAC Appliance 4.1.0
![Cisco](https://files.manualsbrain.com/attachments/7380d0050044647c30f5c24bbbf5d0c0b6d9bb84/common/fit/150/50/faa183d287233c52228cfea3dbc2a127fe780f60564fcb0955d9c3d1cd23/brand_logo.png)
Cisco NAC Appliance - Clean Access Manager Installation and Administration Guide
OL-12214-01
Chapter 4 Switch Management: Configuring Out-of-Band (OOB) Deployment
Configure OOB Switch Management in the CAM
Configure OOB Switch Management in the CAM
This section describes the web admin console configuration steps to implement out-of-band. In general,
you first configure Group, Switch, and Port profiles, as well as the Clean Access Manager’s SNMP
Receiver settings, under Switch Management > Profiles. After profiles are configured, add the switches
you want to control to the Clean Access Manager’s domain under Switch Management > Devices, and
apply the profiles to the switches.
you first configure Group, Switch, and Port profiles, as well as the Clean Access Manager’s SNMP
Receiver settings, under Switch Management > Profiles. After profiles are configured, add the switches
you want to control to the Clean Access Manager’s domain under Switch Management > Devices, and
apply the profiles to the switches.
After switches are added, the ports on the switch are discovered, and the Port and Config buttons and
pages for each switch appear on Switch Management > Devices > Switches > List.
pages for each switch appear on Switch Management > Devices > Switches > List.
Clicking the manage Ports button brings up the Ports tab. The Ports page is where you apply a managed
Port Profile to a specific port(s) to configure how a client’s traffic is temporarily routed through the CAS
for authentication/ certification before being allowed on the trusted network.
Port Profile to a specific port(s) to configure how a client’s traffic is temporarily routed through the CAS
for authentication/ certification before being allowed on the trusted network.
The configuration sequence is as follows:
Step 1
Step 2
Step 3
Step 4
Step 5
Step 6
Step 7
Step 8
Step 9