Cisco Cisco Prime Network Registrar 8.1 Troubleshooting Guide

Page of 26
 
 
 
Cisco Prime Network Registrar IPAM 8.1.1 Disaster Recovery Guide 
  8 
 
 
 
 
 
 
 
 
3 DR Configuration Options 
This section details the options for Disaster Recovery 
(DR) of Cisco Prime Network Registrar IPAM 
Executive services. 
There are three configurations of the Production and 
DR Executives that can support a DR scenario: 
1.  DR Executive assumes the IP of Production 
Executive 
2.  Production and DR Executive use different 
IPs 
3.  Production and DR Executives share a 
SAN/NAS or mirrored database and share a 
virtual IP 
 
3.1  DR Executive assumes the IP of the Production 
Executive 
 
 
Figure 1. Server configuration prior to DR Event 
 
As shown in Figure 1, the Production Executive 
database will be backed up on a regular basis onto the 
DR Executive using the DBMover script.  Only the 
MySQL database service is running on the DR 
Executive.  When the Production Exec fails, the DR 
Exec assumes the Production Executive’s IP address 
and starts all services using a script as shown in 
Figure 2.