Cisco Cisco ONS 15454 M2 Multiservice Transport Platform (MSTP) Information Guide

Page of 3
 
 
Product End-of-Life Notice 
© 2013 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public Information. 
Page 1 of 3 
End-of-Sale and End-of-Life Announcement for the 
Cisco ONS 15454 M6/M2 MSTP First-Generation 
Controller Cards 
EOL9203 
Cisco announces the end-of-sale and end-of-life dates for the Cisco ONS 15454 
M6/M2 MSTP First-Generation Controller Cards. The last day to order the affected 
product(s) is May 31, 2014. Customers with active service contracts will continue to 
receive support from the Cisco Technical Assistance Center (TAC) as shown in 
Table 1 of the EoL bulletin. Table 1 describes the end-of-life milestones, definitions, 
and dates for the affected product(s). Table 2 lists the product part numbers affected 
by this announcement. For customers with active and paid service and support 
contracts, support will be available under the terms and conditions of customers' 
service contract. 
Table 1. 
End-of-Life Milestones and Dates for the Cisco ONS 15454 M6/M2 MSTP First-Generation Controller Cards 
Milestone 
Definition 
Date 
End-of-Life 
Announcement Date 
The date the document that announces the end-of-sale and end-of-life of a product is 
distributed to the general public. 
May 31, 2013  
End-of-Sale Date 
The last date to order the product through Cisco point-of-sale mechanisms. 
The product is no longer for sale after this date. 
May 31, 2014  
Last Ship Date: 
HW 
The last-possible ship date that can be requested of Cisco and/or its contract 
manufacturers. Actual ship date is dependent on lead time. 
August 29, 2014  
End of Routine Failure 
Analysis Date: 
HW 
The last-possible date a routine failure analysis may be performed to determine the 
cause of hardware product failure or defect. 
May 31, 2015  
End of New Service 
Attachment Date: 
HW 
For equipment and software that is not covered by a service-and-support contract, this 
is the last date to order a new service-and-support contract or add the equipment 
and/or software to an existing service-and-support contract. 
May 31, 2015  
End of Service Contract 
Renewal Date: 
HW 
The last date to extend or renew a service contract for the product. 
August 29, 2018  
Last Date of Support: 
HW 
The last date to receive applicable service and support for the product as entitled by 
active service contracts or by warranty terms and conditions. After this date, all support 
services for the product are unavailable, and the product becomes obsolete. 
May 31, 2019  
HW = Hardware 
OS SW = Operating System Software 
App. SW = Application Software 
Table 2. 
Product Part Numbers Affected by This Announcement 
End-of-Sale Product 
Part Number 
Product Description 
Replacement Product 
Part Number 
Replacement Product 
Description 
Additional Information 
15454-M-TNC-B1-K9= 
Transport Node Controller 
for M2, M6 chassis 
15454-M-TNCE-B1K9= 
Transport Node Controller 
Ethernet PTP, ATT NE for 
15454-M-TNC-K9 
Transport Node Controller 
for M2 and M6 Chassis 
15454-M-TNCE-K9 
Transport Node Controller 
Ethernet PTP for M2, M6 
Chassis