Cisco Cisco Broadband Access Center for Cable 4.1 Information Guide
.
Product End-of-Life Notice
© 2009 Cisco Systems, Inc. All rights reserved. This document is Cisco Public Information.
Page 1 of 2
End-of-Sale and End-of-Life Announcement for the Cisco Broadband
Access Center for Broadband Aggregation 2.6
Access Center for Broadband Aggregation 2.6
EOL6828
Cisco announces the end-of-sale and end-of life dates for the Cisco
®
Broadband Access Center for
Broadband Aggregation 2.6. The last day to order the affected product(s) is January 29, 2010. Customers
with active service contracts will continue to receive support from the Cisco Technical Assistance Center
(TAC) as shown in Table 1 of the EoL bulletin. Table 1 describes the end-of-life milestones, definitions,
and dates for the affected product(s). Table 2 lists the product part numbers affected by this
announcement. For customers with active and paid service and support contracts, support will be
available until the termination date of the contract, even if this date exceeds the Last Date of Support
shown in Table 1.
Table 1.
End-of-Life Milestones and Dates for the Cisco Broadband Access Center for Broadband Aggregation 2.6
Milestone
Definition
Date
End-of-Life Announcement
Date
Date
The date the document that announces the end of sale and end of life of a product is
distributed to the general public.
distributed to the general public.
July 31, 2009
End-of-Sale Date
The last date to order the product through Cisco point-of-sale mechanisms. The product is
no longer for sale after this date.
no longer for sale after this date.
January 29, 2010
Last Ship Date:
App. SW
App. SW
The last-possible ship date that can be requested of Cisco and/or its contract
manufacturers. Actual ship date is dependent on lead time.
manufacturers. Actual ship date is dependent on lead time.
April 29, 2010
End of SW Maintenance
Releases Date:
App. SW
Releases Date:
App. SW
The last date that Cisco Engineering may release any final software maintenance releases
or bug fixes. After this date, Cisco Engineering will no longer develop, repair, maintain, or
test the product software.
or bug fixes. After this date, Cisco Engineering will no longer develop, repair, maintain, or
test the product software.
January 29, 2011
End of New Service
Attachment Date:
App. SW
Attachment Date:
App. SW
For equipment and software that is not covered by a service-and-support contract, this is
the last date to order a new service-and-support contract or add the equipment and/or
software to an existing service-and-support contract.
the last date to order a new service-and-support contract or add the equipment and/or
software to an existing service-and-support contract.
January 29, 2011
End of Service Contract
Renewal Date:
App. SW
Renewal Date:
App. SW
The last date to extend or renew a service contract for the product.
April 26, 2012
Last Date of Support:
App. SW
App. SW
The last date to receive service and support for the product. After this date, all support
services for the product are unavailable, and the product becomes obsolete.
services for the product are unavailable, and the product becomes obsolete.
January 28, 2013
HW = Hardware
OS SW = Operating System Software
App. SW = Application Software
Table 2.
Product Part Numbers Affected by This Announcement
End-of-Sale Product Part Number
Product Description
BAC-BA-2.6-100K
BAC for BA RTU for 100K Subscribers or 10K IADs
BAC-BA-2.6-1M
BAC for BA RTU for 1M Subscribers or 100K IADs
BAC-BA-2.6-50K
BAC for BA RTU for 50K Subscribers or 5K IADs
BAC-BA-2.6-FULL-K9
BAC for Broadband Aggregation Base SW, Requires RTU license
BAC-BA-2.6-LITE-K9
BAC for BA Small Deployments SW for 5K Subscribers