Cisco Cisco ONS 15454 M2 Multiservice Transport Platform (MSTP) Manual

Page of 40
Upgrade, Add, and Remove Cards and Nodes

Summary of Contents of manual for Cisco Cisco ONS 15454 M2 Multiservice Transport Platform (MSTP)

  • Page 1: Upgrade, Add, and Remove Cards and NodesUpgrade, Add, and Remove Cards and Nodes
  • Page 2: Upgrade, Add, and Remove Cards and NodesRevised: November 24, 2016, OL-25031-02 Upgrade, Add, and Remove Cards and Nodes Note The terms “Unidirectional Path Switched Ring” and...
  • Page 3Date Notes March 2012 Updated the section, “NTP-G129 Add a DWDM Node”. July 2012 Updated the section “NTP-G130 Remove a...
  • Page 4Caution Removing and replacing cards can be traffic affecting. Caution Do not use this procedure to replace control cards. Procedure...
  • Page 5 • “NTP-G30 Install the DWDM Cards” task in the chapter “Turn Up a Node” of the Cisco ONS 15454...
  • Page 6 • Reconfigure the circuits (OCHCC, OCHNC, Trails) as needed. Complete the “DLP-G280 Delete a PPM” procedure in the chapter...
  • Page 7Procedure Step 1 On the shelf graphic in CTC, double-click the OPT-BST, OPT-BST-E, OPT-BST-L, OPT-AMP-L, OPT-PRE, or OPT-AMP-17-C card with...
  • Page 8 Port 2 (OSC-RX) and Port 3 (COM-TX) of the OPT-BST, OPT-BST-E, or OPT-BST-L cards (or OPT-AMP-L or OPT-AMP-17-C cards...
  • Page 9 Complete the relevant procedures in the chapters “Turn Up a Node” and “Perform Node Acceptance Tests” in the Cisco...
  • Page 10 d) Click Apply, then click OK. Step 19 Complete the “DLP-G180 Clear a Manual or Force Y-Cable or Splitter...
  • Page 11Procedure Step 1 If the Cisco Transport Planner network design has not been updated and recalculated with the node removed,...
  • Page 12 d) Click Close to close the TL1 dialog box. Step 10 Remove the fibers from the target node, and...
  • Page 13Procedure Step 1 Complete the “NTP-G143 Import the Cisco Transport Planner NE Update Configuration File” task in the chapter “Turn...
  • Page 14Prerequisite Procedures One of the following procedures, in the Cisco ONS 15454 Hardware Installation Guide : • “NTP-G301 Connect the...
  • Page 15 Note This step does not apply to passive units that are to be installed within the passive shelf. Note...
  • Page 16 a) Using a cross-over (CAT-5) LAN cable, plug one connector into the MSM port that corresponds to the TNC/TNCE/TSC/TSCE...
  • Page 17Prerequisite Procedures One of the following procedures, in the Cisco ONS 15454 Hardware Installation Guide : • “NTP-G301 Connect the...
  • Page 18 in the chapter “Create Optical Channel Circuits and Provisionable Patchcords”of the Cisco ONS 15454 DWDM Network Configuration Guide ....
  • Page 19 a) Remove the cross-over (CAT 5) LAN cable from the RJ-45 front panel port of the TCC2/TCC2P/TCC3 card in...
  • Page 20Caution This procedure will affect the service of unprotected circuits that pass through the OADM node. Procedure Step 1 Complete...
  • Page 21 For additional information, including valid command values, refer to the Cisco ONS SONET TL1 Command Guide or the Cisco...
  • Page 22 b) Complete the “NTP-G143 Import the Cisco Transport Planner NE Update Configuration File” procedure in the chapter “Turn Up...
  • Page 23Procedure Step 1 Complete the “NTP-G139 Verify Cisco Transport Planner Reports and Files” task in the chapter “Turn Up a...
  • Page 24Step 16 Verify that each circuit appears on the Circuits table with a DISCOVERED status and an IS/Unlocked state. If...
  • Page 25Procedure Step 1 Complete the “NTP-G139 Verify Cisco Transport Planner Reports and Files” task in the chapter “Turn Up a...
  • Page 26 Manually” task in the chapter “Turn Up a Node” of the Cisco ONS 15454 DWDM Network Configuration Guide to...
  • Page 27Onsite/Remote Onsite or remote Security Level Provisioning or higher Caution This procedure will affect the service of unprotected circuits that...
  • Page 28Step 2 Complete the "DLP-G46 Log into CTC" task in the "Connect the PC and Log into the GUI" document...
  • Page 29 The following figure shows the functional view of ROADM Node 1. Figure 2: ROADM Node 1 Functional View Step...
  • Page 30Step 7 Click the Provisioning > WDM-ANS > Optical Side tab. Step 8 In the optical sides table, click the...
  • Page 31 The following figure shows the functional view of ROADM Node 1. Figure 4: ROADM Node 2 Functional View Step...
  • Page 32Step 22 If overhead circuits exist in the amplifier or optical service channel cards installed in Side A of ROADM...
  • Page 33Step 36 Click Create. The Internal Patchcord Creation wizard appears. Step 37 In the Internal Patchcord Attributes page, choose OTS/OCH...
  • Page 34Step 42 Click Next. Step 43 Review the display-only information on the Internal Patchcord Origination Reverse page. This page shows...
  • Page 35Prerequisite Procedures "NTP-G30 Install the DWDM Cards” task in the chapter “Turn Up a Node” of the Cisco ONS 15454...
  • Page 36Tools/Equipment None Prerequisite Procedures "DLP-G46 Log into CTC" task in the "Connect the PC and Log into the GUI" document....
  • Page 37Procedure Step 1 Before you modify the CD value of the TDC-CC or TDC-FC card, run the APC. To run...
  • Page 38Link Description Cisco ONS 15454 DWDM Troubleshooting Guide Provides general troubleshooting instructions, alarm troubleshooting instructions, and a list of error...
  • Page 39© 2016 Cisco Systems, Inc. All rights reserved.
  • Page 40 Americas Headquarters Asia Pacific Headquarters Europe Headquarters Cisco Systems, Inc. Cisco Systems (USA) Pte. Ltd. Cisco Systems International BV...