Cisco Cisco ONS 15454 M2 Multiservice Transport Platform (MSTP)

Page of 40
The following figure shows the functional view of ROADM Node 1.
Figure 4: ROADM Node 2 Functional View
Step 18
Click the Circuits tab.
Step 19
Make a list of all the OCHNCs, OCH trails, and OCHCCs that pass through or terminate (add/drop) at the amplifier or
optical service channel cards installed in Side A of ROADM Node 2.
You will delete all the pass-through and add/drop circuits in the next step and use the list to recreate the circuits
later. Do not proceed until you complete the circuit list.
Caution
Step 20
If OCHNCs and/or OCHCCs identified in
Step 19, on page 31
are routed on the active path of a splitter or Y-cable
protection group, complete the following steps. If not, continue with
Step 21, on page 31
.
a) Display the node containing the amplifier or optical service channel cards with the Y-cable or splitter protection.
b) Force the traffic to the protect path in the opposite side of the ring using the “DLP-G179 Apply a Force Y-Cable or
Splitter Protection Switch” task in the
document.
Step 21
Delete the circuits identified in
Step 19, on page 31
using one or more of the following tasks:
• “DLP-G347 Delete Optical Channel Client Connections” task in the chapter “Create Optical Channel Circuits and
Provisionable Patchcords” of the Cisco ONS 15454 DWDM Network Configuration Guide
• “DLP-G418 Delete an Optical Channel Trail” task in the chapter “Create Optical Channel Circuits and Provisionable
Patchcords” of the Cisco ONS 15454 DWDM Network Configuration Guide
• “DLP-G106 Delete Optical Channel Network Connections” task in the chapter “Create Optical Channel Circuits and
Provisionable Patchcords” of the Cisco ONS 15454 DWDM Network Configuration Guide
31