Cisco Cisco Process Orchestrator 2.X User Guide

Page of 828
 
8-16
Cisco Tidal Enterprise Orchestrator Reference Guide
OL-24928-01
Chapter 8      Managing Triggers
  Defining a Task Changed Trigger
Defining a Task Changed Trigger
The Task trigger is used to specify the criteria to match within the task to trigger the process. When the 
value of the task matches the criteria, the process will be triggered. Use the following steps to specify 
the criteria necessary to trigger when a matching task has been modified. 
To define a task trigger:
Step 1
On the Process—Triggers tab, click New > Task > [Task Changed] and then choose one of the 
following task triggers. 
The Task Changed Properties dialog box displays. 
Step 2
On the General tab, specify the following information:
Step 3
Click the Original Task Criteria tab to continue. 
Note
The Required Value 
 icon displayed on a tab or page indicates that the field is required and is missing 
a value.
Field
Description
Display Name
Name of the trigger
Type
Display-only. Type of trigger
Description
Brief description of the trigger
Enabled
The Enabled check box is checked by default. The checked 
box indicates the target group is available for execution. 
Uncheck the check box to disable the object. If the check 
box is unchecked, the object is disabled and will be 
unavailable for execution.