Cisco Cisco Process Orchestrator 2.X User Guide
C H A P T E R
10-1
Cisco Tidal Enterprise Orchestrator Reference Guide
OL-24928-01
10
Managing Conditions
The conditions assigned to an object within a process specify when an action is to be taken based on an
evaluation of conditions that have been defined. This chapter provides instructions on creating and
modifying condition properties from within a trigger as well as modify conditions added from the Logic
workspace in the Process Editor.
evaluation of conditions that have been defined. This chapter provides instructions on creating and
modifying condition properties from within a trigger as well as modify conditions added from the Logic
workspace in the Process Editor.
•
•
•
•