Cisco Cisco Process Orchestrator 3.1 User Guide

Page of 786
 
13-143
Cisco Process Orchestrator 3.1 User Guide
 
Appendix 13      Using Adapters
  UCS Director Adapter
<![CDATA[
<ExecuteVMCommand>
<!-- Accepts value from the list: vm-->
<vmId>17</vmId>
<userName>test</userName>
<password>test</password>
<commdPath>test</commdPath>
<commdArgs>test</commdArgs>
</ExecuteVMCommand>
]]>
</payload>
</cuicOperationRequest>  
  •
Timeout—The timeout time in seconds, minutes, hours, or days.
  •
Restart when interrupted—Whether to restart the operation if it is interrupted.
Step 4
Enter the information in the remaining tabs as necessary, then click Save to complete the activity 
definition.
Defining a Cisco UCS Director Workflow
This activity starts a Cisco UCS Director workflow with optional specified inputs, and optionally waits 
for a period of time for the workflow to complete.
Step 1
In the Process Editor Toolbox, choose AMQP > Execute Cisco UCS Director Workflow, then drag and 
drop the activity onto the Workflow pane.
Step 2
Click the General tab and enter the required information.
Step 3
Click the Workflow tab and enter:
  •
The workflow name.
  •
A list of workflow properties, which consist of substitutable string / type / substitutable encrypted 
string (can reference encrypted strings like HTTP Request).
  •
Whether to restart the operation if it is interrupted.
  •
Whether to wait for completion. If configured to wait for completion, this activity will fail if the 
workflow times out, fails, or is canceled on the Cisco UCS Director side.
Step 4
Click the Advanced tab and enter the required information.
Step 5
Enter the information in the remaining tabs as necessary, then click Save to complete the activity 
definition.