Cisco Cisco Process Orchestrator 3.0 User Guide

Page of 242
 
4-7
Cisco Process Orchestrator User Guide
OL-30196-01
Chapter 4      Administration
  Managing the Report Database
The reporting technology is installed separately from the product. Typically a reporting installation 
spans Process Orchestrator servers.
Creating a Reporting Database Connection
The Process Orchestrator Reporting database is initially created during the installation process. There 
are occasions when the report database connection may need to be removed and then re-connected. 
Before You Begin
  •
You must be logged in with an account that has Administrator rights on the machine where the report 
database is being created, whether it is the local machine or a remote machine. 
  •
You must also have Reporting Services permission to create or modify the reports as create or 
modify permission over the Report Database object within Cisco Process Orchestrator.
To create the report database connection:
Step 1
Choose Administration > Database Settings, right-click Report Database and choose Create Process 
Orchestrator Reporting Database
.
Step 2
The Welcome to the Report Database Configuration Wizard panel displays. Click Next.
Step 3
The fields on the New Process Orchestrator Reporting Database panel (excluding the Password field) are 
automatically populated with the name of the local server and the credentials of the currently logged in 
user. Use one of the following methods:
  •
To use the credentials that are autopopulated for the default user, enter the password in the Password 
field.
  •
Specify the credentials for a different user, then click Next.
Step 4
The fields on the Database Settings panel are automatically populated with the default locations and data 
grooming settings for the database. Use one of the following methods:
  •
To use the information that is auto-populated, click Next.
  •
To modify the data and transaction log file settings for the new database, specify the appropriate 
information, then click Next.
Step 5
When the dialog box indicates that the database has been successfully created, click Next.
Step 6
Verify the information and click Finish to complete the procedure and close the wizard.