Cisco Cisco Dynamic Fabric Automation for OpenStack Leaflet

Page of 80
If you have anything other than a Cisco Nexus 6000 Series switch, you must physically replace the switch
with Release 7.0.(0)N1(1); the configuration remains the same as the previous image.
Note
Step 1
On the Cisco Nexus 6000 Series spine switches, perform a nondisruptive in-service software upgrade (ISSU) upgrade
to Cisco NX-OS Release 7.0(0)N1(1).
See the
for instructions on performing
the ISSU upgrade.
No impact to traffic should occur as a result of the ISSU upgrade.
Step 2
Add Cisco Dynamic Fabric Automation-specific configuration on the spine.
For more information, see
.
What to Do Next
Proceed to Step 2 to upgrade the first pair of border leafs in the topology.
Step 2: Upgrading the Border Leaf Software
You can perform a disruptive in-service software upgrade (ISSU) for the first border leaf pair.
Before You Begin
Before you perform an ISSU upgrade, move any existing switch virtual interface (SVI) configurations from
other switches in the spine-leaf topology to the border-leaf pair nodes.
You must perform configuration on the border-leaf nodes manually, not through power-on auto-provisioning
(POAP).
Note
Step 1
Upgrade the first border leaf node from Cisco NX-OS Release 6.0.(2)N2 to Cisco NX-OS Release 7.0.(0)N1(1) using
an ISSU disruptive upgrade procedure. See the
Step 2
Verify that the first border leaf comes up fully and becomes operational again.
Step 3
Verify that the traffic streams are already running intra-VLAN, inter-VLAN, across pods, and that north-bound traffic
remains unaffected.
Step 4
Repeat Steps 1 to 3 for the second border leaf node in the pair.
Although the disruptive upgrade has some effect on traffic, traffic flow is not changed
   Cisco Dynamic Fabric Automation Migration Guide
22
OL-31503-01   
Migration Steps
Step 2: Upgrading the Border Leaf Software