Cisco Cisco 1 GHz GainStar Node Installation Guide

Page of 92
4042027 Rev A 
Installation and Configuration 
    2-1 
Chapter 2   
Installation and Configuration 
Overview 
Introduction
 
This chapter provides instructions for installing and configuring the GainStar Node 
Forward Injection in your cable system. 
In This Chapter 
Topic 
See Page 
Before You Begin 
2-2 
Opening the Node Housing 
2-5 
Attaching the Coaxial Connectors
 
2-6 
Installing the Housing
 
2-9 
Installing the Accessories 
2-11 
Installing the RF Module 
2-15 
Removing and Installing AC Shunt 
2-16 
Removing and Reinstalling the Optical Modules 
2-18 
Removing the RF Module from the Housing 
2-22 
Connecting the Fiber Optical Service Cable to the Node 
2-24 
Attaching the Fiber Connectors 
2-26 
Closing the Node Housing 
2-28 
Upgrading the Forward Injection Node 
2-29