Cisco Cisco 1 GHz GainStar Node Installation Guide
Installing the Accessories
OL-31947-02
19
Installing the Accessories
To Install the Attenuator Pads
Complete the following steps to install the attenuator pads in the GainStar Mini
Node.
Note: For the best results, follow this installation procedure exactly.
1 Start this procedure with the housing open. Refer to Opening the Mini Node
Node.
Note: For the best results, follow this installation procedure exactly.
1 Start this procedure with the housing open. Refer to Opening the Mini Node
Housing.
Note: These accessories can be installed without removing the cover.
Note: These accessories can be installed without removing the cover.
2 Install the pad(s) specified by the design print in the appropriate pad slot(s).
Note:
Be sure that all the pins on the bottom of the attenuator pad align with the
pin holes in the attenuator pad slot, allowing the attenuator pad to be
installed flat against the GainStar Mini Node module.
pin holes in the attenuator pad slot, allowing the attenuator pad to be
installed flat against the GainStar Mini Node module.
The forward output pad and the forward interstage pad (1 GHz: 3 dB; 862
MHz: 2 dB) are installed at the factory to set the operational gain of the
station. Do not change these pads in the field unless required by the system
design.
MHz: 2 dB) are installed at the factory to set the operational gain of the
station. Do not change these pads in the field unless required by the system
design.
3 Install other options or accessories as desired.