Cisco PowerKEY CableCARD Module 802 Installation Guide

Page of 120
 
 
 
Delivering ECMs 
 
78-4017672-01 Rev E 
89 
 
Delivering ECMs 
Introduction 
The system elements descriptions in the PowerKEY Conditional Access System 
Overview
 (on page 3) sectopm and the following ECM delivery process describe 
how the PowerKEY ECMs arrive at the set-top.  
The process begins with system initialization and proceeds to the DNCS/ISDS and 
SCS/Scrambler interactions outlined below: 
 
The PCG is fully configured and provisioned 
 
The DNCS/ISDS creates sessions on the PCG 
 
The SCS establishes a TCP connection, channel, and valid streams on the PCG 
 
The PCG responds with ECM streams for existing sessions/services setup by the 
DNCS/ISDS on the PCG 
 
Delivering ECMs 
Note: This process assumes that the PCG has been set up. If you need to set up the 
PCG, see Install the PCG Software (on page 15). 
1  When the PCG powers up, it can be configured manually or using BOOTP. Then 
the eth0 gets its network address and the PCG application is launched. 
2  The PCG sends a provision request to the DNCS/ISDS. When the DNCS/ISDS 
receives the request, it sends the PCG a provision response.  The response 
contains data that sets the eth1 network address for communication with the 
scrambler device(s).   
Optional: The response may inform the PCG about how many such devices can 
communicate with the PCG, provide their IP addresses, and indicate how many 
programs can be serviced on each device. 
Note: The PCG can support a maximum of 1000 sessions.  
3  Create a session from the DNCS/ISDS. This provides the access criteria for the 
PCG to service.  
Note: If you are using ROSA for access criteria management then configure the 
EIS/Access Criteria Manager Component (ACMC) through the ROSA element 
manager. Ensure the access criteria specified here match the access criteria