Cisco Dual Tier Addressable Stretch Tap Installation Guide
Enabling Drop Powering
590212 Rev G
31
3 Using insulated pliers, plug a PTC assembly into the socket corresponding to the
drop port on which you want to enable power. For example, installing a PTC
assembly in PTC3 location activates drop port 3. Refer to the illustration below.
assembly in PTC3 location activates drop port 3. Refer to the illustration below.
WARNING:
Avoid electrical shock or damage to this product. Use insulated pliers to
install or remove PTC assemblies.
Avoid electrical shock or damage to this product. Use insulated pliers to
install or remove PTC assemblies.
4 If the drop has a 75
terminator, remove the terminator.
CAUTION:
Avoid damage to this product. Remove any terminators from the drop port
before applying AC to the drop port.
Avoid damage to this product. Remove any terminators from the drop port
before applying AC to the drop port.
5 Repeat steps 3 and 4 for each drop port on which you want to enable power.
6 Inspect the technician access panel gasket and all mating surfaces. Wipe off any
6 Inspect the technician access panel gasket and all mating surfaces. Wipe off any
dirt, moisture, or debris.
7 Close the technician access panel and finger-tighten the bolts.