End-of-Sale and End-of-Life Announcement for the
Cisco PowerVu Network Centre Live Event
Controller HP Server Hardware
Cisco PowerVu Network Centre Live Event
Controller HP Server Hardware
EOL9591
Cisco announces the end-of-sale and end-of-life dates for the Cisco PowerVu Network
Centre Live Event Controller HP Server Hardware. The last day to order the affected
product(s) is January 29, 2015. Customers with active service contracts or active
warranties will continue to receive support from the Cisco Technical Assistance
Center (TAC) as shown in Table 1 of the EoL bulletin. Table 1 describes the
end-of-life milestones, definitions, and dates for the affected product(s). Table 2 lists
the product part numbers affected by this announcement. For customers with active
service contracts or active product warranties, support will be available for the shown
dates as stated in the applicable service contracts or product warranty terms and
conditions, even if this date exceeds the Last Date of Support shown in Table 1.
Centre Live Event Controller HP Server Hardware. The last day to order the affected
product(s) is January 29, 2015. Customers with active service contracts or active
warranties will continue to receive support from the Cisco Technical Assistance
Center (TAC) as shown in Table 1 of the EoL bulletin. Table 1 describes the
end-of-life milestones, definitions, and dates for the affected product(s). Table 2 lists
the product part numbers affected by this announcement. For customers with active
service contracts or active product warranties, support will be available for the shown
dates as stated in the applicable service contracts or product warranty terms and
conditions, even if this date exceeds the Last Date of Support shown in Table 1.
Table 1.
End-of-Life Milestones and Dates for the Cisco PowerVu Network Centre Live Event Controller HP Server Hardware
Milestone
Definition
Date
End-of-Life
Announcement Date
Announcement Date
The date the document that announces the end-of-sale and end-of-life of a product is
distributed to the general public.
distributed to the general public.
July 31, 2014
End-of-Sale Date
The last date to order the product through Cisco point-of-sale mechanisms. The product is
no longer for sale after this date.
no longer for sale after this date.
January 29, 2015
Last Ship Date:
HW
HW
The last-possible ship date that can be requested of Cisco and/or its contract manufacturers.
Actual ship date is dependent on lead time.
Actual ship date is dependent on lead time.
April 29, 2015
End of Routine Failure
Analysis Date:
HW
Analysis Date:
HW
The last-possible date a routine failure analysis may be performed to determine the cause of
hardware product failure or defect.
hardware product failure or defect.
January 29, 2016
End of New Service
Attachment Date:
HW
Attachment Date:
HW
For equipment and software that is not covered by a service-and-support contract, this is the
last date to order a new service-and-support contract or add the equipment and/or software
to an existing service-and-support contract.
last date to order a new service-and-support contract or add the equipment and/or software
to an existing service-and-support contract.
January 29, 2016
End of Service Contract
Renewal Date:
HW
Renewal Date:
HW
The last date to extend or renew a service contract for the product.
April 26, 2019
Last Date of Support:
HW
HW
The last date to receive applicable service and support for the product as entitled by active
service contracts or by warranty terms and conditions. After this date, all support services for
the product are unavailable, and the product becomes obsolete
service contracts or by warranty terms and conditions. After this date, all support services for
the product are unavailable, and the product becomes obsolete
**
. Warranty duration is
based on product ship dates; refer to warranty terms and conditions for details.
January 31, 2020
HW = Hardware
OS SW = Operating System Software
App. SW = Application Software