Cisco Cisco D9859 Advanced Receiver Transcoder Installation Guide

Page of 374
 
 
 
Connecting the Transcoder to Other Equipment 
 
OL-29780-01 
 
Connecting the Transcoder to Other Equipment 
The following displays the rear panel of the D9859 transcoder: 
 
 
1  Connect the L-Band signal to RF1. 13V or 18V LNB power is only available on 
the RF1 port. The factory default setting for LNB power is OFF. 
2  Connect the ASI OUT port to an ASI device for digital tier applications. 
Note: A double-shielded coaxial cable is required to connect to the ASI OUT 
and/or the ASI IN port in order to meet EMC requirements. 
3  Connect the Composite Video Outputs to a video monitor. 
4  Using a multi-conductor, pluggable cable, connect the balanced audio outputs, 
terminal blocks AUDIO 1 and AUDIO 2 to monitoring equipment. 
5  Apply power by connecting the transcoder to a power outlet. The message 
“Application Starting” will appear on the front panel. The boot-up process will 
take approximately 1 minute for the unit to initialize. When ready, the front 
panel display shows the start-up screen. 
The power cord (consisting of appliance coupler, flexible cord, and plug) 
supplied with this product meets the requirements for use in the country for 
which this product was purchased. In general, the power cord must be approved 
by an acceptable, accredited agency responsible for evaluation in the country 
where the product will be used.