Cisco GainMaker Optoelectronic Node 1GHz with 65 86 MHz Split Information Guide
Product End-of-Life Notice
© 2016 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public Information.
Page 1 of 3
End-of-Sale and End-of-Life Announcement for the
GainMaker Optoelectronic Node 1GHz with 40/52
MHz Split and RF Redundancy
GainMaker Optoelectronic Node 1GHz with 40/52
MHz Split and RF Redundancy
EOL10953
Cisco announces the end-of-sale and end-of-life dates for the GainMaker
Optoelectronic Node 1GHz with 40/52 MHz Split and RF Redundancy. The last day to
order the affected product(s) is April 29, 2017. Customers with active service contracts
or active warranties will continue to receive support from the Cisco Technical
Assistance Center (TAC) as shown in Table 1 of the EoL bulletin. Table 1 describes
the end-of-life milestones, definitions, and dates for the affected product(s). Table 2
lists the product part numbers affected by this announcement. For customers with
active service contracts or active product warranties, support will be available for the
shown dates as stated in the applicable service contracts or product warranty terms
and conditions.
Optoelectronic Node 1GHz with 40/52 MHz Split and RF Redundancy. The last day to
order the affected product(s) is April 29, 2017. Customers with active service contracts
or active warranties will continue to receive support from the Cisco Technical
Assistance Center (TAC) as shown in Table 1 of the EoL bulletin. Table 1 describes
the end-of-life milestones, definitions, and dates for the affected product(s). Table 2
lists the product part numbers affected by this announcement. For customers with
active service contracts or active product warranties, support will be available for the
shown dates as stated in the applicable service contracts or product warranty terms
and conditions.
Table 1.
End-of-Life Milestones and Dates for the GainMaker Optoelectronic Node 1GHz with 40/52 MHz Split and RF
Redundancy
Redundancy
Milestone
Definition
Date
End-of-Life
Announcement Date
Announcement Date
The date the document that announces the end-of-sale and end-of-life of a product is
distributed to the general public.
distributed to the general public.
October 29, 2016
End-of-Sale Date
The last date to order the product through Cisco point-of-sale mechanisms.
The product is no longer for sale after this date.
The product is no longer for sale after this date.
April 29, 2017
Last Ship Date:
HW
HW
The last-possible ship date that can be requested of Cisco and/or its contract
manufacturers. Actual ship date is dependent on lead time.
manufacturers. Actual ship date is dependent on lead time.
July 28, 2017
End of Routine Failure
Analysis Date:
HW
Analysis Date:
HW
The last-possible date a routine failure analysis may be performed to determine the
cause of hardware product failure or defect.
cause of hardware product failure or defect.
April 29, 2018
End of New Service
Attachment Date:
HW
Attachment Date:
HW
For equipment and software that is not covered by a service-and-support contract, this
is the last date to order a new service-and-support contract or add the equipment
and/or software to an existing service-and-support contract.
is the last date to order a new service-and-support contract or add the equipment
and/or software to an existing service-and-support contract.
April 29, 2018
End of Service Contract
Renewal Date:
HW
Renewal Date:
HW
The last date to extend or renew a service contract for the product.
July 25, 2021
Last Date of Support:
HW
HW
The last date to receive applicable service and support for the product as entitled by
active service contracts or by warranty terms and conditions. After this date, all
support services for the product are unavailable, and the product becomes obsolete
active service contracts or by warranty terms and conditions. After this date, all
support services for the product are unavailable, and the product becomes obsolete
**
.
Warranty duration is based on product ship dates; refer to warranty terms and
conditions for details.
conditions for details.
April 30, 2022
HW = Hardware
OS SW = Operating System Software
App. SW = Application Software