Cisco Cisco Digital Service Access Node (DSAN) 8210 Installation Guide
Before You Begin
OL-30954-01
39
The following accessories may be necessary to install the DSAN:
Heat shrink tubing (optional)
Heavy-duty wire cutters or snips for cutting the cable
A propane torch or electric heat gun applicator for heat shrink (if shrink tubing is
used)
used)
A selection of attenuators (pads) with values ranging from 0 dBm to 20.5 dBm
A selection of forward equalizers
Torque Specifications
Fastener
Torque Specification
Illustration
Seizure nut
2 to 5 ft-lb
(2.7 to 6.8 Nm)
(2.7 to 6.8 Nm)
Strand clamp mounting bracket
bolts
bolts
5 to 8 ft-lb
(6.8 to 10.8 Nm)
(6.8 to 10.8 Nm)
Pedestal mounting bolts
8 to 10 ft-lb
(10.8 to 13.6 Nm)
(10.8 to 13.6 Nm)
75
terminator
Per manufacturer instructions
(Appearance
varies by
manufacturer)
varies by
manufacturer)
RF amplifier cover screws
10 to 13 in-lb
(1.1 to 1.5 Nm)
(1.1 to 1.5 Nm)
Power supply, and high-pass
filter module shoulder screws
filter module shoulder screws
18 to 20 in-lb
(2.0 to 2.3 Nm)
(2.0 to 2.3 Nm)
Housing closure bolts
5 to 12 ft-lb
(6.8 to 16.3 Nm)
(6.8 to 16.3 Nm)
Housing plugs
Test point port plugs
Test point port plugs
5 to 8 ft-lb
(6.8 to 10.8 Nm)
(6.8 to 10.8 Nm)
RF cable connector
Per manufacturer instructions