Cisco GainMaker Optoelectronic Node 1GHz with 65 86 MHz Split Installation Guide

Page of 174
Chapter 2    Installation and Configuration 
 
 
 
Before You Begin 
Before you start the installation procedure, make sure you have all the tools and 
accessories ready. You also need to know the torquing specifications for the node. 
 
Tools 
The following tools are needed to configure and install the node: 
 
Torque wrench with a 1/2-inch socket 
 
Hex driver or ratchet 
 
Flat-blade screwdriver 
 
Phillips-head screwdriver 
 
Accessories 
The following accessories may be necessary to configure and install the node: 
 
Heat shrink tubing (optional) 
 
Heavy-duty wire cutters or snips for cutting the cable   
 
A propane torch or electric heat gun applicator for heat shrink (if shrink tubing is 
used) 
 
A selection of attenuators (pads) with values ranging from 0 dBm to 20.5 dBm 
 
A selection of forward and reverse equalizers 
 
Torque Specifications 
The following table gives the torque specifications for the node. 
 
Fastener 
Torque Specification 
Illustration 
Seizure nut 
2 ft-lb to 5 ft-lb 
(2.7 Nm to 6.8 Nm) 
 
Housing hinge screw 
5 in-lb to 8 in-lb 
(0.56 Nm to 0.90 Nm) 
 
Power supply module 
securing screws 
18 in-lb to 20 in-lb 
(2.0 Nm to 2.3 Nm) 
 
Strand clamp mounting 
bracket bolts 
5 ft-lb to 8 ft-lb 
(6.8 Nm to 10.8 Nm) 
 
 
12 
OL-29644-03