Balancing the Reverse Path 
 
Balancing and Alignment Procedures 
This procedure applies whether balancing the reverse along with the forward or if 
balancing the reverse independently. It requires one technician at the node and one 
technician at the headend or hub site to set up the reverse fiber link. 
It is good practice to set up the link with the highest optical loss budget first, and to 
always balance the reverse fiber link before attempting to balance any of the reverse 
amplifiers in the distribution plant. 
Complete the following steps to balance the reverse fiber link. 
1  Ensure that the design value reverse pads are installed in the appropriate reverse 
pad slots in the amplifier and reverse optical transmitter input. The reverse pads 
are as follows: 
 
Reverse main input pad for each station port 
 
Reverse output pad 
 
Reverse transmitter input pad 
Note: See illustration in step 4 for location of the reverse transmitter input pad. 
 
2  Refer to the reverse system design print and inject the proper RF signal level into 
the amplifier via the reverse injection test point. For the exact location of the 
reverse injection test point, refer to the illustration in step 1. 
The reverse system design print should specify a “design” reverse input level at 
the station’s reverse input port(s). You must inject the correct signal level into the 
reverse injection test point using an RF test probe and a reverse sweep 
transmitter or a CW signal generator. The reverse injection test point has 20 dB of 
insertion loss (-20 dB injection point). 
Note: To calculate the correct signal level to inject, you must first calculate the 
input level to the reverse amplifier module. 