Cisco GainMaker Optoelectronic Node 1GHz with 65 86 MHz Split Installation Guide

Page of 182
 
Removing and Installing AC Shunt Power Directors 
3  To insert a power director, refer to the systems design print to determine AC 
power routing and install the AC shunt power directors in the required 
locations. 
Note: If supplying power to the node through the main input port, a power 
inserter must be installed to terminate the RF signal. 
4  Close the node housingRefer to 
To Close the Node Housing (on page 17). 
 
 
 
 
OL-30035-03 
39