Cisco GainMaker Optoelectronic Node 1GHz with 65 86 MHz Split Installation Guide

Page of 13
 
 
 
GainMaker Node 
Mains Power Pack Kit 
Installation Instructions 
Overview 
Audience 
These installation instructions are intended for cable system operators and 
installers who need to install a GainMaker Node Mains Power Pack Kit. 
Introduction 
The GainMaker Node Mains Power Pack Kit allows a GainMaker node to operate 
from local utility power, 100-240 VAC. It is intended for indoor applications 
where the use of local utility power is required or preferred. The source of AC 
power can be a nearby utility outlet or an uninterrupted power supply (UPS). 
These installation instructions explain how to install the GainMaker Node Mains 
Power Pack Kit. 
Note: 
 
The following instructions apply to standard GainMaker Nodes, Reverse 
Segmentable GainMaker Nodes, and 4-Port GainMaker Nodes. 
 
For additional information on node installation and configuration, refer to the 
appropriate node installation and operation guide. 
Qualified Personnel 
Only appropriately qualified and skilled service personnel should attempt to 
install, operate, maintain, and service this product. 
 
  
WARNING: 
Allow only qualified and skilled personnel to install, operate, maintain, and 
service this product. Otherwise, personal injury or equipment damage may 
occur.