Cisco GainMaker Optoelectronic Node 1GHz with 65 86 MHz Split Installation Guide

Page of 10
 
 
 
GainMaker Node 
SMC Status Monitor Transponder 
Installation Instructions 
Overview 
Introduction 
The GainMaker® Node System Monitoring and Control (SMC) Transponder (part 
number 744234) is designed to be installed in the lid of the GainMaker Node 
housing. The SMC Transponder can be configured after it is installed in a 
powered node, either on a test bench or on site. The transponder must be 
configured before it can be activated in the Transmission Network Control System 
(TNCS). 
 
Purpose 
These installation instructions will enable cable system operators or installers to 
properly install and configure a GainMaker Node SMC Transponder in a 
GainMaker Node. 
 
Audience 
This document is intended for authorized service personnel who have experience 
working with similar equipment. The service personnel should have appropriate 
background and knowledge to complete the procedures described in this 
document. 
Qualified Personnel 
Only appropriately qualified and skilled service personnel should attempt to 
install, operate, maintain, and service this product. 
 
  
WARNING: 
Allow only qualified and skilled personnel to install, operate, maintain, and 
service this product. Otherwise, personal injury or equipment damage may 
occur.