Cisco Headend System Release 2.7

Page of 174
 
Chapter 3    Staging SSC DHCTs 
 
 
 
86 
736107 Rev D 
DHCTs with Only POWER LED Indicators 
DHCTs with only POWER LED indicators display the codes associated with 
downloading, installing, and booting into the SARA as a series of flashing lights 
using the POWER LED indicator light on the front panel. 
 
Note: You must stage DHCTs with only POWER LED indicators using the CVT 
download method. 
 
SSC DHCT Download 
The following table shows an example of a CVT download sequence of front panel 
LED displays that appear after AC power is applied to the DHCT.  
Stage  POWER LED 
Indicator 
TV Monitor 
Description 
The light is off. 
 
The “wave” appears each time 
the DHCT resets. The DHCT is 
initializing and testing the 
system. The wave provides a 
visual cue as to when to press 
buttons to force auxiliary 
functions. 
2  
Solid on, then off. The 
light is off as the 
DHCT boots into the 
OS. 
 
or 
 
The rotating border appears 
when the DHCT boots into the 
OS. 
3  
The light blinks once 
every half-second. 
 
Fr.LA appears if the DHCT can 
tune to the last known good 
frequency in NVM and acquires 
the CVT. 
Go to stage 9 of this table.