Cisco Model GS7000 4-Port Node 1 GHz with 42 54 Split Installation Guide

Page of 282
 
 
Enhanced Digital Return (EDR) System Installation 
OL-29643-02 
211 
 
Enhanced Digital Return (EDR) System Installation 
Before You Begin 
Overview 
Perform these installation instructions only if you are upgrading the GS7000 Node 
with the EDR. If your node came with the EDR installed, go to Reverse Balancing the 
Node with Digital Return Modules
 (on page 234). 
Required Tools 
The following tools and equipment are needed to configure and install the EDR. 
 
½-inch hex driver or ratchet 
 
Two adjustable wrenches for coaxial connectors 
 
Standard flat-head or phillips-head screwdriver 
 
Torque wrench, capable of settings up to 100 in-lb (11.3 Nm) 
 
Operating Environment 
Before operating the node with the EDR installed, ensure that the operating 
environment meets the following standards. 
 
Ambient temperature range outside the node must be maintained between -40°C 
and +60°C (-40°F to 140°F). 
 
Storage temperature range of the EDR must be maintained between -40°C to 
+85°C (-40°F to 185°F). 
 
Humidity range must be maintained between 5% to 95% non-condensing before 
installation of the EDR Digital Return module(s).