Cisco Model D-PCG1000 PowerKEY CAS Gateway Installation Guide

Page of 136
 
Chapter 2    Installing the Dual SFP GQAM 
 
 
 
14 
4014102 Rev C 
Installation Process Summary 
Introduction 
This section provides the installation process and lists the detailed procedures in this 
guide that correspond with each process step. 
Important! To ensure proper installation, read this entire guide before starting 
installation and then follow these processes in the order shown. 
 
Before You Begin 
This process assumes that you have already installed the GQAM software on the 
DNCS. Refer to the GQAM Software Version 4.0.6 Release Notes and Installation 
Instructions
, for detailed instructions. Also be sure that you have access to the Digital 
Network Control System Online Help 
before starting installation. 
 
Installation Processes 
The following process summary provides the recommendations for installation. 
 
Stage 
Process 
See Procedure 
Review system requirements and 
technical specifications. 
Installation Requirements (on page 23) 
Installation and Operation 
Requirements
 (on page 112) 
Consult your Bandwidth Management 
Plan and the input/output 
specifications to allocate your 
bandwidth resources properly. 
Installation Requirements (on page 23) 
Installation and Operation 
Requirements
 (on page 112) 
Unpack and inspect the Dual SFP 
GQAM 
Unpack and Inspect the GQAM (on page 
17) 
Record the MAC address from the 
label located on the underside of the 
modulator. 
Record the MAC Address (on page 18) 
Install the Dual SFP GQAM into a rack. 
 
Stacking Guidelines (on page 19) 
 
Install the Modulator Into a Rack 
(on page 23)