Cisco Model D-PCG1000 PowerKEY CAS Gateway Installation Guide
Chapter 2 Installing the Dual SFP GQAM
14
4014102 Rev C
Installation Process Summary
Introduction
This section provides the installation process and lists the detailed procedures in this
guide that correspond with each process step.
guide that correspond with each process step.
Important! To ensure proper installation, read this entire guide before starting
installation and then follow these processes in the order shown.
installation and then follow these processes in the order shown.
Before You Begin
This process assumes that you have already installed the GQAM software on the
DNCS. Refer to the GQAM Software Version 4.0.6 Release Notes and Installation
Instructions, for detailed instructions. Also be sure that you have access to the Digital
Network Control System Online Help before starting installation.
DNCS. Refer to the GQAM Software Version 4.0.6 Release Notes and Installation
Instructions, for detailed instructions. Also be sure that you have access to the Digital
Network Control System Online Help before starting installation.
Installation Processes
The following process summary provides the recommendations for installation.
Stage
Process
See Procedure
1
Review system requirements and
technical specifications.
technical specifications.
2
Consult your Bandwidth Management
Plan and the input/output
specifications to allocate your
bandwidth resources properly.
Plan and the input/output
specifications to allocate your
bandwidth resources properly.
3
Unpack and inspect the Dual SFP
GQAM
GQAM
Unpack and Inspect the GQAM (on page
17)
17)
4
Record the MAC address from the
label located on the underside of the
modulator.
label located on the underside of the
modulator.
Record the MAC Address (on page 18)
5
Install the Dual SFP GQAM into a rack.
Stacking Guidelines (on page 19)
Install the Modulator Into a Rack
(on page 23)
(on page 23)