Cisco Model D-PCG1000 PowerKEY CAS Gateway Installation Guide

Page of 178
 
Chapter 2    Installing the GoQAM 
 
 
 
18 
Error! No text of specified style in document. 
Unpack and Inspect the GoQAM 
Carrier’s Responsibility 
Cisco thoroughly inspects and carefully packs all products before shipment. The 
carrier is responsible for safe shipping and delivery. 
 
If there are any missing parts or if there is damage to the product contact Cisco 
Services. 
 
Retain all boxes for future equipment shipping needs. The boxes are specifically 
designed for shipping the GoQAM. 
 
Unpacking and Inspecting Procedure 
Complete the following steps to unpack and inspect the modulator. 
1  Review the Safety Precautions. 
2  Inspect the shipping carton for visible damage. 
3  Open the shipping carton. 
4  Remove all packing material. 
5  Inspect the product for visible damage. 
6  Inspect for loose items that may indicate concealed damage. 
7  Inspect for missing parts using the packing slip as a guide. 
8  Go to 
Record the MAC Address (on page 19).