Cisco Headend System Release 2.7 Installation Guide

Page of 154
 
 
 
Stop System Components 
 
4042225 Rev A 
51 
 
6  Are there any entries in the PAT Configuration table? 
 
If yes, continue with step 7. 
 
If no, skip to step 11. 
7  Select the first entry in the BIG PAT window and click Delete Entry. A 
confirmation window appears. 
8  Click Yes to confirm the deletion of this entry. An Information message appears 
and informs you that all BFS sessions must be torn down and rebuilt for the 
deletion to take effect. 
Notes:   
 
 
The Information message only appears for the first entry you delete. 
 
Although you must respond to this question, you do not need to tear down 
and rebuild these sessions because you will delete the BIG later in this 
procedure. 
Click OK
10  Repeat steps 6-8 until you have deleted every entry in the BIG PAT window and 
then go to step 11. 
11  From the BIG PAT window, click Close
12  From the Set Up BIG window, click Apply and then click Save
13  From the BIG List window, select the BIG and then click File and select Delete
A confirmation window appears. 
14  Click Yes to confirm the deletion of the BIG. 
15  Close the BIG List window. 
 
Stopping the System Components 
Follow these instructions to stop the system components. 
1  In the Application Server xterm window, type exit and press Enter to switch to 
the dncs user. 
2  Complete the following steps to stop the processes on the Application Server. 
Type the following command and press Enter. The Application Server 
processes stop. 
appStop
 
b  Type the following command and press Enter. The initd process on the 
Application Server is shut down. 
appKill
 
c  Type the following command and press Enter to determine if the processes 
have stopped. The processes are stopped when there are no processes listed 
in the output. 
pgrep -fl dvs
  
d  Change to root user on the Application Server and type the following 
command and press Enter to disable cron jobs. 
svcadm –v disable –s cron