Cisco Headend System Release 3.2 Installation Guide

Page of 154
 
Chapter 1    Planning the Upgrade 
 
 
 
4042225 Rev A 
Estimated Timeline 
The upgrade to SR 5.0 features the Solaris Live Upgrade which provides the ability 
to “stage” an area on disk with the upgraded operating system and application 
software prior to entering the maintenance window. 
Most sites should be able to complete an upgrade within a typical 6 hour 
maintenance window. However, depending on the size of your system, it could take 
longer. Key factors are the size of your database and the number of headend 
elements. 
Post upgrade procedures involve resetting the modulators. Our engineers 
recommend that you never reset more than eight modulators at once. Refer to the 
following table for estimated times for resetting the modulators. 
Number of 
Modulators 
Minutes 
(approx. 4 minutes per 
modulator, 8 at a time) 
60 
30 to 38 
100 
50 to 63 
150 
75 to 94 
200 
100 to 125 
250 
125 to 157