Appendix D 
SR i4.2.2 Rollback Procedures for the DVD Upgrade 
122 
4036631 Rev B 
Which Rollback Procedure to Run 
Two rollback procedures exist for rolling back from SR i4.2.2. Identify the rollback 
procedure you should use based upon your hardware platform and whether you 
have already enabled disk mirroring. 
 
Sun Fire V880 or V890 DNCS and Sun Fire V240 or V245 Application Server 
Two rollback procedures exist for these servers: 
 
Sun Fire V445, V880, or V890 DNCS 
 
Sun Fire V240 or V245 Application Server 
Read the following choices to help you decide which to use. 
 
If you have not already run the procedure under Enable Disk Mirroring (on page 
105), then use the procedure under Activate the Old System Release (on page 
123) to roll back from SR i4.2.2. 
Notes:   
 
It should take you about 10 minutes to roll back the Sun Fire V445, V880 or 
V890 DNCS, as well as the Sun Fire V240 or V245 Application Server using 
the Activate the Old System Release procedure.  
 
It should take you about 1 hour to roll back the Sun Blade 150 Application 
Server using the Activate the Old System Release procedure. 
 
If you have already run the procedure under Enable Disk Mirroring (on page 
105), then use the procedures to restore the DNCS and Application Server file 
systems and the Informix database in DBDS Backup and Restore Procedures For SR 
2.2 Through 4.3 User Guide (part number 4013779). 
Notes:   
 
It may take as long as 4 hours to roll back the Sun Fire V445, V880 or V890 
DNCS.  
 
It should take you about 1 hour to roll back the Sun Blade 150 Application 
Server, or the Sun Fire V240 or V245 Application Server.