Cisco Headend System Release 2.7 Maintenance Manual

Page of 202
 
Chapter 3    Staging SSC DHCTs 
 
 
 
100 
4024836 Rev D 
Verify Binding Using the Staging Toolkit 
Note: This section is for SARA systems only. 
You can verify the host/CableCARD module binding process using the staging 
toolkit. 
 
Verifying Binding Using the Staging Toolkit 
Notes:
  
 
You must have DVR 1.5.3.p3302/SARA_1.90.05.a109 or later to use this feature. 
 
This feature is only available on DHCTs with full display, alphanumeric LEDs. 
1  Activate the staging toolkit using the instructions found in 
Staging Toolkit (on 
page 185). 
2  Once you have activated the staging toolkit, press to verify the status of the 
binding process between the host and the CableCARD module.  
The following table shows the LED indicators and what these indicators mean. 
 
LED Display 
Description 
Notes 
 
Error obtaining binding status 
The toolkit could not identify the 
binding status. 
 
CableCARD module is busy with binding 
authentication process 
The CableCARD module is in 
process of binding with the host. 
Wait a few minutes to see if they 
bind correctly. 
 
Not bound for CableCARD module 
reasons 
Binding failed due to an error on 
the CableCARD module. 
 
Not bound, Host Certificate Invalid 
Binding failed because the host 
was found on the CRL. 
 
Not bound, failed to verify Host Signature  Binding failed because the host 
signature was not verified. 
 
Not bound, failed to match AuthKey from 
Host Device 
Binding failed because the 
Authorization Key on the host 
device did not match the 
Authorization Key on the 
CableCARD module. 
 
Binding Failed, other reasons 
Binding failed due to other, 
unspecified errors. 
 
Validated, validation message received, 
authenticated, and the IDs match those in 
the current binding 
Binding was successful.