Cisco Headend Digital Broadband Delivery System Maintenance Manual
Chapter 3 Staging SSC DHCTs
100
4024836 Rev D
Verify Binding Using the Staging Toolkit
Note: This section is for SARA systems only.
You can verify the host/CableCARD module binding process using the staging
You can verify the host/CableCARD module binding process using the staging
toolkit.
Verifying Binding Using the Staging Toolkit
Notes:
Notes:
You must have DVR 1.5.3.p3302/SARA_1.90.05.a109 or later to use this feature.
This feature is only available on DHCTs with full display, alphanumeric LEDs.
1 Activate the staging toolkit using the instructions found in
Staging Toolkit (on
page 185).
2 Once you have activated the staging toolkit, press 5 to verify the status of the
binding process between the host and the CableCARD module.
The following table shows the LED indicators and what these indicators mean.
LED Display
Description
Notes
Error obtaining binding status
The toolkit could not identify the
binding status.
CableCARD module is busy with binding
authentication process
The CableCARD module is in
process of binding with the host.
Wait a few minutes to see if they
bind correctly.
Not bound for CableCARD module
reasons
Binding failed due to an error on
the CableCARD module.
Not bound, Host Certificate Invalid
Binding failed because the host
was found on the CRL.
Not bound, failed to verify Host Signature Binding failed because the host
signature was not verified.
Not bound, failed to match AuthKey from
Host Device
Binding failed because the
Authorization Key on the host
device did not match the
Authorization Key on the
CableCARD module.
Binding Failed, other reasons
Binding failed due to other,
unspecified errors.
Validated, validation message received,
authenticated, and the IDs match those in
the current binding
Binding was successful.