Cisco Model D-PCG1000 PowerKEY CAS Gateway Release Notes

Page of 47
 
2-22 
Upgrading the QAM Modulator With QAM Software Version 2.3.5 
78-738174-01 Rev B 
Download QAM Software Version 2.3.5 to the QAM Modulators,
 Continued 
Resetting the QAM Modulator Through the DNCS GUI 
  CAUTION: 
All active sessions on the QAM modulator will be interrupted when the 
modulator is reset. DHCTs downstream of the modulator will lose their ability 
to display services until sessions are reestablished.  
Follow these steps to reboot the modulator by resetting it from the DNCS. 
1. 
If you have not already done so, provision the modulator on the DNCS.  
Note:  For instructions on provisioning the QAM modulator, refer to QAM 
Modulator Model D9476 Installation and Operation Guide
2. 
From the DNCS Administrative Console, click the DNCS tab, click the 
Element Provisioning tab, and then click QAM
Result:  The QAM List window opens. 
3. 
Open an xterm window on the DNCS for use later in this procedure. 
4. 
Based on the order you determined earlier, select the QAM modulator that 
you want to reset by highlighting it in the QAM List window. 
Important: The following diagram shows an example of a QAM modulator 
selected in the QAM List window.