Cisco Model D-PCG1000 PowerKEY CAS Gateway Release Notes
![Cisco](https://files.manualsbrain.com/attachments/7380d0050044647c30f5c24bbbf5d0c0b6d9bb84/common/fit/150/50/faa183d287233c52228cfea3dbc2a127fe780f60564fcb0955d9c3d1cd23/brand_logo.png)
4019300 Rev B
SARA Server 3.1.6 Installation Instructions
2-39
System Validation Tests
Introduction
After you restart the cron jobs and the billing and other third-party applications, you
must perform system validation tests.
Prerequisites
The test DHCT(s) you use for this procedure must meet the following conditions:
•
•
Must be authorized for all third-party applications
•
Must not be authorized to view a PPV event without specifically buying the
PPV event
•
Must have a working return path and be capable of booting into two-way mode
Verifying a Successful Installation
Complete these steps to verify that SARA Server 3.1.6 installed successfully.
Important: If this procedure fails, do not continue with the remaining procedures in
Important: If this procedure fails, do not continue with the remaining procedures in
this publication. Instead, contact Cisco Services.
1.
Perform a slow-and-fast boot on a test DHCT as follows:
a) Boot a DHCT.
Note: Do not press the power button.
b) Access the Power On Self Test and Boot Status Diagnostic Screen on
the DHCT and verify that all parameters, except UNcfg, display
Ready.
Note: UNcfg displays Broadcast.
c) Wait 5 minutes.
d) Press the power button on the DHCT.
d) Press the power button on the DHCT.
Result: The DHCT powers on.
e) Access the Power On Self Test and Boot Status Diagnostic Screen on
the DHCT.
f) Do all of the parameters, including UNcfg, display Ready?
−
If yes, go to step 2.
−
If no, contact Cisco Services.
2.
Ping the DHCT.