Cisco Headend System Release 2.7 Technical References
6
OL-31937-01
Post-Installation Checks
VMs
Important: Do not power on the VMs after installation.
1
1
Log into the vSphere client.
2 Make sure that all 6 nodes are deployed in VBO.
Note: The CMS node can be deployed at a later time.