Getting Started with the CWA Client
Monitoring Jobs
When you pause job launching, jobs can still be scheduled and calendars compiled, but jobs will not actually launch until 
job launching is resumed.
To pause the production schedule or job launching:
1.
From the Navigator pane, select Operations > Job Activity
 to display the Job Activity pane.
2.
From the Activities main menu, select Pause Scheduler or
 Pause Job Launching.
Rearranging Columns in the Job Activity Pane
To rearrange columns:
1.
From the Navigator pane, select Operations > Job Activity
 to display the Job Activity pane.
2.
From the View main menu, select Preferences or right-click the Navigator pane and select Preferences from the 
context menu to display the Preferences dialog. 
3.
Click the Columns tab. 
4.
Select the column and click the up or down arrows to arrange the titles into the desired order.
Recreating the Production Schedule
To recreate the production schedule:
1.
From the Navigator pane, select Operations > Job Activity
 to display the Job Activity pane.
2.
From the Activities menu, select Create Schedule to display the Create Schedule dialog.
3.
Select the date range for which to create the schedule.
4.
If you want repeating jobs with no time window to start immediately, rather than after midnight, select the For today’s 
repeating jobs with no time window, start repeating ASAP 
option.
5.
CWA searches for all qualified jobs to add to the production schedule for the selected dates.
Note:
 Warning: All job occurrences that were added manually and all records of jobs that ran will be lost. Furthermore, 
the Create Schedule recreates the schedule at the time you issue the command. This means that jobs whose 
dependencies have not been met can qualify to run immediately. Use this command with caution.
Refreshing the Job Activity Pane
To refresh:
1.
From the Navigator pane, select Operations>Job Activity
 to display the Job Activity pane.
2.
From the View main menu, select Refresh.
Resuming the Production
 Schedule or Job Launching
To resume the production schedule or job launching:
1.
From the Navigator pane, select Operations>Job Activity
 to display the Job Activity pane.
2.
From the Activities main menu, select Resume Scheduler or Resume Job Launching.