Job Activity
Job Activity Configuration Procedures
Refreshing the Job Activity Pane
To refresh:
1.
From the Navigator pane, select Operations>Job Activity
 to display the Job Activity pane.
2.
From the View main menu, select Refresh.
Resuming the Production
 Schedule or Job Launching
To resume the production schedule or job launching:
1.
From the Navigator pane, select Operations>Job Activity
 to display the Job Activity pane.
2.
From the Activities main menu, select Resume Scheduler or Resume Job Launching.
Saving a Job’s Output on the Master
You can view the output of a job after the job finishes running. In order to view the output of a job from the Job Activity 
pane, you must save the output for the job on the master (this is the default).
To save a job’s output on the master:
1.
From the Navigator pane, select Definitions>Jobs
 to display the Jobs pane.
2.
Select the job for which to save output.
3.
Click the Edit button to display the
 Job Definition dialog.
4.
Click the Options tab. 
5.
In the Save Output option, select Append or Replace.
6.
Click OK. The next time the job completes, you can view its output from the Job Details dialog.
Selecting or Removing All Job Filters in the Job Activity Pane
To select or remove all job filters:
1.
From the Navigator pane, select Operations>Job Activity
 to display the Job Activity pane.
2.
Click the Filter button on the CWA toolbar or right-click the Navigator pane and select Filter from the context menu 
to display the Job Filter
 dialog.
3.
Right-click in the Statuses section and select Check All or
 Uncheck All from the context menu.
Setting the Completion Status of a Job
Note: You should only set the completion status of jobs that have already finished running. Setting completion status of 
a job that is still active, may adversely affect job activity.
To set the completion status:
1.
From the Navigator pane, select Operations>Job Activity
 to display the Job Activity pane.
2.
Select the job on which to perform job control.
3.
Right-click the job to open the Job Activity context menu.
4.
From the Job Control submenu, select Set and from the Set submenu, select the desired job completion status.