Controlling Production
Calendars Interface
Description Tab
Description —A free text field for up to 255 characters (optional).
Daily Calendar
 
Definition Dialog
The Daily Calendar Definition dialog displays when you add or edit a Daily calendar.
Common to All Tabs
Calendar Name —The name of the calendar (up to 60 characters). The name must be unique.
Owner —The owner of the calendar. By default, this is the creator of the calendar. An owner can be a CWA user or 
workgroup.
Starting on —Sets the starting date by which the dates are automatically selected for the calendar. Any dates before 
the starting date are not selected. Though the forecast is limited to a finite period, the calendar has no ending date. 
CWA calculates calendars for the remainder of the current year, plus three more years.
Public —The Public option makes the calendar accessible to all CWA users within the boundaries of their security 
policy. When cleared, only the calendar’s owner can see and use the calendar.
Details Tab (Daily Calendar)
The Details tab contains the following elements:
Frequency —Sets the frequency in days by which the days are automatically selected for the calendar.
Include the following days —Includes the selected days of the week in the date generation process. Excluded days 
will not be used as production dates, but will be counted during calendar calculation. When the calendar production 
date is calculated to fall on an excluded day of the week, the date generation process chooses the next included 
day and restarts the count starting from that day.
For example: 
If you set the frequency to 2 days, starting Monday, and exclude Saturday and Sunday, you will get Mon, Wed, Fri, 
(Sun skipped, go to next available day) 
Mon (reset count), Wed, ‚Ķ. 
Although Saturday and Sunday were excluded days of the week, they were counted during date generation. 
Because Saturday and Sunday were excluded, when the next calendar production date was calculated as 
Sunday, the next non-excluded day of the week (Monday) was selected. 
Since the count for date generation is restarted after an excluded day is skipped, the next calendar date was 
Wednesday.
Conditions Tab
Refer to the Conditions tab for a group calendar on 
 for a description of the fields on this tab.
Forecast Tab
Refer to the Forecast tab for a daily calendar on 
 for a description of the fields on this tab.
Description Tab
Description —A free text field for up to 255 characters (optional).