Cisco Cisco Tidal Enterprise Scheduler 6.2 User Guide
4-34
Cisco Tidal Enterprise Scheduler HP OMU Integration Guide
6.2.1 SP3
Chapter 4 Event ID Tables
Job Event Triggers
12020
Job might not be
ready by end of its
time window
ready by end of its
time window
Schedule
Irregularity
Irregularity
The end of the job’s time window
might not be reached before its
dependencies are met. This trigger is
activated approximately 7 seconds
before the job’s estimated start time
becomes later than the end of the job’s
time window
might not be reached before its
dependencies are met. This trigger is
activated approximately 7 seconds
before the job’s estimated start time
becomes later than the end of the job’s
time window
12021
Job running longer
than expected
than expected
Schedule
Irregularity
Irregularity
The job is running longer than its
estimated duration value. The job
continues to run unless you stop it with
a Job Control action that is associated
with this event trigger, or unless an
operator stops it. You initially set the
Estimated Duration value in the Job
Definition dialog box when you create
the job.
estimated duration value. The job
continues to run unless you stop it with
a Job Control action that is associated
with this event trigger, or unless an
operator stops it. You initially set the
Estimated Duration value in the Job
Definition dialog box when you create
the job.
<z_sys>sys<z_Star>*<z_ADMIRAL
>ADMIRAL adjusts the value to a
historical average after each run of the
job.
>ADMIRAL adjusts the value to a
historical average after each run of the
job.
12022
Job running past end
of its time window
of its time window
Schedule
Irregularity
Irregularity
The job is running past the time
window set for it in its job definition.
The job continues to run unless it is
stopped with an associated job control
action, or unless it is stopped by an
user.
window set for it in its job definition.
The job continues to run unless it is
stopped with an associated job control
action, or unless it is stopped by an
user.
12023
Job might run pst
end of its time
window
end of its time
window
Schedule
Irregularity
Irregularity
The job might run past the time
window set for it in its job definition.
The job will continue to run unless it is
stopped with an associated job control
action, or unless it is stopped by the
user. This trigger is activated at the end
of the job’s time window minus the
job’s estimated duration.
window set for it in its job definition.
The job will continue to run unless it is
stopped with an associated job control
action, or unless it is stopped by the
user. This trigger is activated at the end
of the job’s time window minus the
job’s estimated duration.
12025
Job finished later
than expected
than expected
Schedule
Irregularity
Irregularity
The job ran longer than the time
specified in the Estimated Duration
field in its job definition.
specified in the Estimated Duration
field in its job definition.
12026
Job running longer
than its maximum
time
than its maximum
time
Schedule
Irregularity
Irregularity
The job is running longer than its
Maximum Duration value, as defined
in its job definition. The job continues
to run unless you stop it with a job
control action that is associated with
this event trigger, or unless it is
stopped by an user.
Maximum Duration value, as defined
in its job definition. The job continues
to run unless you stop it with a job
control action that is associated with
this event trigger, or unless it is
stopped by an user.
12027
Job ran shorter than
its minimum time
its minimum time
Schedule
Irregularity
Irregularity
The job ran in less time than the time
specified in the Minimum Duration
field in its job definition
specified in the Minimum Duration
field in its job definition
Table 4-1
Job Event Triggers
Event ID
Trigger
Event Type(s)
Description