Cisco DNCS System Release 2.7 3.7 4.2 Installation Guide
Index
110
OL-31613-01
Resetting Modulators Through the auditQam
Utility • 61
Resetting Modulators Through the EC WUI • 58
Resetting Modulators Through the Modulator
Panel • 60
Resetting QPSK Modulators • 63
Restart System Processes • 50
Restarting the Application Server at Rovi
Corporation Sites • 51
Restarting the Time Warner Mystro Application
Server • 51
Revise the sshd_config File on the DTACS
Server • 91
Run fixSiteConfigs on the RNCS EC • 45
Run the postUpgrade Script on Each Upgraded
Server • 52
Run the setupAS Script on the EC • 31
S
Set the Clock on the TED (Optional) • 68
Set the Power Policy • 12
Shut Down and Reboot the Servers • 27
Solaris x86 Installation • 13
SR 7.0 Application Installation and Migration •
17
SR 7.0 Installation and Migration on the New
VM • 18
SR 7.0 Post Upgrade Procedures • 37
SR 7.0 Upgrade Requirements • 2
Starting EC Processes on the VM • 50
Stop All Third Party Utilities • 22
Stop and Disable Unneeded Processes • 47
Stop System Components • 22
Stopping the System Components and Migrating
the Database and Key Files • 22
Suspend Billing Transactions • 22
T
Tear Down BFS and OSM Sessions • 54
Test dbSync on the DTACS Server • 93
Third Party Applications • 5
U
Update the Authorization File • 105
V
Verify the Channel Map After the Upgrade • 78
Verify the crontab Entries • 64
Verify the Number of BFS Sessions • 53
Verify the System Upgrade • 76
Verify the Upgrade • 67
Verify User Ownership and Group Permissions •
92
Verifying the crontab Entries • 64
Verifying the Number of Recovered BFS
Sessions • 53
VM Solaris Tools • 15
W
Which Reset Method to Use • 58