Cisco Cisco Videoscape Voyager Vantage 3.0 Installation Guide
Phase Two CVT Checks
OL-26412-01
29
Phase Two CVT Checks
CVT Installation Steps
1
Create or update test group(s) for each DHCT type and revision that will be
upgraded using the CVT download process.
Note: A test group can contain multiple types of set-tops so you can have a
single test group for all of your test devices.
upgraded using the CVT download process.
Note: A test group can contain multiple types of set-tops so you can have a
single test group for all of your test devices.
2 Load the new image files onto the BFS.
3 Download the new software to the test groups.
4 Verify that the test devices operate as expected by checking the following:
3 Download the new software to the test groups.
4 Verify that the test devices operate as expected by checking the following:
Verify that the IPG contains 7 days of data
Verify that all third-party applications are available and functioning as
expected.
expected.
5 You have completed Phase Two. Save a copy of these Phase Two checks and the
results from any tests that you completed during this phase. Go to Phase Three -
Install New Software (on page 41).
Install New Software (on page 41).