Cisco Cisco Videoscape Voyager Vantage 3.0 Installation Guide

Page of 66
 
 
 
Phase Two CVT Checks 
 
OL-26412-01 
29 
 
Phase Two CVT Checks 
CVT Installation Steps 
Create or update test group(s) for each DHCT type and revision that will be 
upgraded using the CVT download process. 
Note: A test group can contain multiple types of set-tops so you can have a 
single test group for all of your test devices. 
2  Load the new image files onto the BFS. 
3  Download the new software to the test groups. 
4  Verify that the test devices operate as expected by checking the following: 
 
Verify that the IPG contains 7 days of data 
 
Verify that all third-party applications are available and functioning as 
expected. 
5  You have completed Phase Two. Save a copy of these Phase Two checks and the 
results from any tests that you completed during this phase. Go to Phase Three - 
Install New Software
 (on page 41).