Cisco Cisco OptoStar II Driver Amplifier Installation Guide

Page of 75
Operating using ICIM LCD 
This section describes how to use the OptoStar II ICIM LCD to operate the 
OptoStar II power supply module.   
Start
 
1.  Make sure that the power cable on the rear panel of the OptoStar II power 
supply module has been connected.   
2.  Turn the front panel switch of the power supply module to ON position. The 
power supply module will initialize for about 5 seconds, and the ICIM will 
load for about 25 seconds. 
Note: The system will achieve optimal working condition after one hour’s 
warm-up. 
The LCD now displays ICIM loading screen as shown below. 
 
3.  When the device initialization is complete, remove the ICIM display and 
begin operation. 
 
Continued on next page 
 
 
3-6 
 
Operation 
OL-29659-03